Skip to content

Weekly Update ~ 7.17.26

Median Island Construction

Median islands are being constructed throughout the Maryland Pkwy corridor, as part of a broader effort to improve safety and traffic flow along a very busy corridor. Research consistently shows that raised medians help reduce the severity of crashes by eliminating high speed crossing conflicts and limiting unpredictable mid block turning movements. Instead, they encourage drivers to make left turns at safer, controlled locations such as signalized intersections or designated U turn points.

Safe. Comfortable. Accessible Connections!

Welcome to the Maryland Parkway
Bus Rapid Transit (BRT) project.

Construction Progress

Construction Phasing

Work hours may be extended to maintain the project schedule. Watch for lane shifts as work progresses. Whenever possible, additional travel lanes will be provided. Business and residential access will be maintained. On-street parking will be impacted as work progresses.

Home
Home
Maryland Pkwy, Russell to Tropicana

Two lanes open in each direction
– SB: Planting trees. NB: Utility work by others.

Home
Maryland Pkwy, Tropicana to Flamingo

Two lanes open in each direction
– SB: Planting trees. NB: Utility work by others.

Home
Maryland Pkwy, Flamingo to Desert Inn

Work Hours: 8pm-7am
Day: Two lanes open in each direction
Night: One lane open in each direction
– Construction of driveways, install of storm drain, conduit and traffic signals, preparing the west half (Desert Inn to Flamingo) for paving in late July/early August.

Dumont Blvd closed at Maryland Pkwy through early August. See details above.

Home
Maryland Pkwy, Desert Inn to Sahara

Work Hours: 8pm-7am
Two lanes open in each direction with lane reductions as needed
– Install of storm drain, construction of sidewalk and median islands.

Home
Maryland Pkwy, Sahara to Charleston

– Final clean-up work as needed.

Home
Maryland Pkwy/Rue 13, Charleston to Carson

– Final clean-up work as needed.

Home
Carson Ave, Casino Center Blvd to 13th St

– Final clean-up work as needed.

Home
Bonneville Ave, Casino Center Blvd to MLK Blvd

– Final clean-up work as needed.

Home
Alta Dr, MLK Blvd to Tonopah Dr

– Final clean-up work as needed

Home
Tonopah Dr, Alta Dr to Wellness Way

– Final clean-up work as needed

Adjacent Project: www.livetheoscar.com

Home
Wellness Way, Tonopah Dr to Shadow Ln

– Final clean-up work as needed

Copyright ©2024 Regional Transportation Commission of Southern Nevada. All Rights Reserved.